Skip links

Redfern - Bitumen Membranes

PROBLEM

Extensive leaking through failed membrane system to residence below from podium level.

Solution

Demolish all podium features and fixtures Remove old membrane system Install new, 3 Layer Torch applied system as specified by Cardno Engineers.

READY TO DISCUSS YOUR NEXT PROJECT?