Kiama Hospital – Bitumin Membrane

Project: Kiama Hospital

Requirement:
Extensive leaking into several wards due to an old bitumen based asbestos membrane having perished on roof flats.

Solution:
Remove old membrane back to bare timber sheeting, dispose the old membrane accordingly to environmental legislation and apply new PVC membrane system.

Materials:
Sika Sarnafil G410-20L Felt Back membrane fully adhered using Sarnacol 2142S adhesive.

 




How can we help you?

We've helped many companies to get rid of their headaches. Let us help you too, connect with us today!

What People Say

Keystone has successfully helped many clients with various problems such as waterproofing issues, concrete repair, epoxy injection, epoxy floors, slab strengthening, from brand new build to heritage listed.

Request A Quote

Don’t Waste Time Any Further, Get a Quote From Us Today!

Our Newsletter

Get updates directly to your email. Subscribe to our newsletter today.