Redfern - Bitumin Membranes
Redfern 3 Layer Bitumin Membrane installation.
Requirement:
Extensive Leaking through failed membrane system to residence below from podium level.
Solution:
Demolish all podium features and fixtures, remove old membrane system and install new 3 Layer Torch applied system as specified by Cardno Engineers.
Materials:
Parchem 3 Layer Torch applied system and Emerclad.